Kettering General Hospital

Approximately 1,812 linear metres of pre-insulated pipework serving eleven buildings at Kettering General Hospital.

JGD project profile

Kettering General Hospital

After several months of pre-construction planning in consultation with key stakeholders, JGD District Heating was appointed to deliver the pre-insulated pipe heat network for Kettering General Hospital’s redevelopment.

The scheme is part of a £400 million programme to rebuild and expand the hospital, with a view to supporting the organisation’s wider Net Zero ambitions.

JGD was chosen through the project specialist mechanical contractor to deliver 1,812 linear metres of pre-insulated pipework to serve 11 buildings across the hospital site.

The network is being installed using Series 2 single pre-insulated pipework with fusion-welded BandJoint systems. NDT testing ensures quality standards are met across the installation.

This project demonstrates JGD’s ability to deliver large-scale specialist heat network infrastructure in complex, operational healthcare environments.