North London Heat & Power Project

Specialist district heating infrastructure integrated into a major energy-from-waste development at Edmonton EcoPark.

Aerial view of the North London Heat and Power Project at Edmonton EcoPark

Case study · Edmonton EcoPark

North London Heat & Power Project

JGD was appointed by ACCIONA to deliver a complex district heating network within one of London’s most significant energy and resource-recovery developments.

Contract value£645,000 excl. VAT
Pipe systemLOGSTOR pre-insulated pipework
Annual capacityUp to 700,000 tonnes of waste
LocationEdmonton EcoPark, London
Discuss a similar project

The challenge

Integrating heat infrastructure into a major energy programme.

The scheme replaces a 53-year-old energy-from-waste facility with a new Energy Recovery Facility, Resource Recovery Facility and public Reuse and Recycling Centre.

The future facility is designed to process up to 700,000 tonnes of waste each year. Alongside resource recovery, it will provide electricity to the national grid and heat to a local district heating network.

JGD’s solution

JGD coordinated closely with ACCIONA’s civil and structural teams to manage the installation sequence and maintain progress in a high-demand environment. The work included large-diameter pre-insulated LOGSTOR pipework and the specialist interfaces required to integrate it into the wider development.

By combining installation expertise with active coordination, JGD helped create an efficient, future-focused heating network that will support local communities and wider infrastructure for years to come.

Aerial view of the North London Heat and Power Project at Edmonton EcoPark

FAQs

About the North London project

Clear answers help teams make better early decisions. For project-specific guidance, speak with JGD.

What was JGD’s role at Edmonton EcoPark?

JGD was appointed to deliver the specialist district heating network, coordinating installation with the project’s civil and structural teams.

What pipework was installed?

The project included large-diameter LOGSTOR pre-insulated pipework, including DN400 sections referenced in JGD’s project updates.

What will the wider project provide?

The North London Heat and Power Project includes new energy and resource-recovery infrastructure, providing electricity to the grid and heat for a local district heating network.

Why was coordination important?

The pipework formed part of a complex live programme with structural, civil, logistics and high-demand installation interfaces.